Ara
Toplam kayıt 2, listelenen: 1-2
Analyzing a Drum-Buffer-Rope scheduling system executability through simulation
(2007)
This study was carried out in a plastic workshop of a refrigerator factory to solve problems of excessive work in process. In order to provide synchronous manufacturing between Capacity Constrained Resources (CCR) and ...
Integer Programming Formulations for the Uncapacitated Vehicle Routing p-Hub Center Problem
(Modelling & Simulation Soc Australia & New Zealand Inc, 2015)
Hub facilities are used in many-to-many transportation networks such as passenger airlines, parcel delivery, and telecommunication system networks. In these networks, the flow that is interchanged between the demand centers ...