dc.contributor.author | Bakış, Recep | |
dc.contributor.author | Altan, Metin | |
dc.contributor.author | Gümüşlüoğlu, Elif | |
dc.contributor.author | Tuncan, Ahmet | |
dc.contributor.author | Ayday, Can | |
dc.contributor.author | Önsoy, Hızır | |
dc.date.accessioned | 2019-10-21T21:11:39Z | |
dc.date.available | 2019-10-21T21:11:39Z | |
dc.date.issued | 2008 | |
dc.identifier.issn | 1301-045X | |
dc.identifier.uri | http://www.trdizin.gov.tr/publication/paper/detail/T0RnM016SXk= | |
dc.identifier.uri | https://hdl.handle.net/11421/21101 | |
dc.description.abstract | Bu makalede, Porsuk havzasına ait küçük hidroelektrik enerji potansiyeli araştırılmıştır. Bu amaçla, çalışma alanı Porsuk havzası seçilmiştir. Porsuk havzasındaki küçük ölçekli hidroelektrik potansiyelin değerlendirilmesi ve bölge/ülke ekonomisine kazandırılması amaçlanmıştır. Araştırmada, Porsuk Çayı ve yan kolları üzerinde yeni planlaması yapılabilecek küçük hidroelektrik santrallerin yapılabilir olup olmadıkları araştırılmıştır. Makale’de, 1/25.000’lik haritalardan, baraj yerlerinin tespiti yapılmış, arazide bu yerlerin topoğrafik, zemin ve jeolojik bakımından uygunluğu incelenmiş ve uydu görüntüleri ile sayısallaştırılmış haritalarla desteklenmiştir. Bütün Porsuk havzası dikkate alındığında, Porsuk Çayı ve yan dereleri üzerinde planlaması öngörülebilecek 8 adet bölgede, yeni baraj yapımına uygun yerler tespit edilmiştir. Porsuk havzasındaki toplam su potansiyeli kullanılarak, 8,42 MW kurulu güç ile 30,212 GWh/yıl elektrik üretmek mümkündür. Bu yatırımların toplam maliyeti yaklaşık 75,65x106 US$ olacaktır. Hesaplar, Porsuk havzasındaki su kaynaklarının ve yağışın, iklim değişikliği nedeniyle kuraklıktan %30 oranında etkilemesi hali için bulunmuştur. Söz konusu yağışların normal seyretmesi halinde, elde edilecek elektrik enerjisi miktarı daha fazla olacaktır. | en_US |
dc.description.abstract | In this paper, small hydropower potential in Porsuk river basin has been investigated. For this purpose, Porsuk river basin has been selected as a research area. The objective is to assessment the small hydroelectric plants in Porsuk river basin and to gain region's/country economy. In this research, the feasibility of the possible small hydropower plants that can be planed on the Porsuk river and its side branches have been investigated. In this paper, the location of the dams are determined by using 1/25.000 scale maps, the suitability of them is investigated in terms of topographical, soil and geological and supported by satellite pictures. When the whole Porsuk river basin is considered, suitable location for new dam construction have been determined on Porsuk river which is main stream and on considerable 8 regions on Porsuk basin and side branches. It is possible to produce electricity of 30.212 GWh/y with 8.42 MW power by using the total water potential in Porsuk basin. Approximately, the total cost of these investments will be $75.65x106. The affect of climate changes of Porsuk River is found in conditions when the water resources and rainfall are affected due to drought by 30%. The electrical energy amount received is greater in the case of normal levels of rainfall. | en_US |
dc.language.iso | tur | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Mimarlık | en_US |
dc.title | Porsuk havzası su potansiyelinin hidroelektrik enerji üretimi yönünden incelenmesi | en_US |
dc.title.alternative | Investigation of the water potential of Porsuk basin with respect to hydroelectric energy production | en_US |
dc.type | other | en_US |
dc.relation.journal | Eskişehir Osmangazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi | en_US |
dc.contributor.department | Anadolu Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü | en_US |
dc.identifier.volume | 21 | en_US |
dc.identifier.issue | 2 | en_US |
dc.identifier.startpage | 125 | en_US |
dc.identifier.endpage | 162 | en_US |
dc.relation.publicationcategory | Diğer | en_US |
dc.contributor.institutionauthor | Bakış, Recep | |
dc.contributor.institutionauthor | Avşar, Özgür | |