Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorYılmaz, G.
dc.contributor.authorİkiz, S.
dc.contributor.authorKaradayilar, T.
dc.contributor.authorGünay, A.
dc.date.accessioned2019-10-18T19:02:40Z
dc.date.available2019-10-18T19:02:40Z
dc.date.issued2008
dc.identifier.isbn9781622761760
dc.identifier.urihttps://hdl.handle.net/11421/10775
dc.descriptionNational Institute of Disaster Management (NIDM);American Society of Civil Engineers (ASCE)en_US
dc.description12th International Conference on Computer Methods and Advances in Geomechanics 2008 -- 1 October 2008 through 6 October 2008 -- Goa -- 93907en_US
dc.description.abstractA cut-off wall was implemented for a shopping mall to be constructed in Eskisehir/Turkey. The subject site is located near Porsuk River on an alluvial plain. Local geology of the subject site consists of Quaternary aged alluvial deposits overlying Eosen and Neogene aged marls and limestones. In the soil investigation results, it was reported that the alluvial deposits consists of sandy gravely layers with occasional boulders. The groundwater level was around 4.0 m below ground surface. An excavation of 9.5 m depth for foundations and basements of the mall was deemed necessary. Considering the available soil investigation data, a retaining structure composed of diaphragm wall socketed into the marl layers and supported with one level of prestressed anchors was designed. The method of construction was selected therefore to implement the diaphragm wall by means of hydraulic grab equipment based on the reported subsoil conditions. According to construction schedule imposed, the site had to be divided into two pieces in order to proceed partial superstructure construction. For this purpose, a cut-off wall to be formed by jet grouting in the mid of the site was also envisaged. During the implementation of the diaphragm wall, the encountered local subsoil conditions indicated that there exist very hard conglomeratic levels below alluvial layers in various thickness and elevation which was not identified during soil investigations. Therefore, the penetration of diaphragm wall through this hard conglomeratic layer was very difficult and therefore, since the diaphragm wall could not be closed on foreseen schedule the designed jet grouting cut-off became absolute and as a result undesired delay in completion of excavation work was inevitable.en_US
dc.language.isoengen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectCut-Offen_US
dc.subjectDiaphragm Wallen_US
dc.subjectSoil Investigationsen_US
dc.titleA case study on the importance of local geology on selection of cut-off wall construction procedureen_US
dc.typeconferenceObjecten_US
dc.relation.journal12th International Conference on Computer Methods and Advances in Geomechanics 2008en_US
dc.contributor.departmentAnadolu Üniversitesien_US
dc.identifier.volume6en_US
dc.identifier.startpage4683en_US
dc.identifier.endpage4688en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster